检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:汤巍 陈玉娇 刘源 庞希斌 祝加勇 TANG Wei;CHEN Yu-jiao;LIU Yuan;PANG Xi-bin;ZHU Jia-yong(Hunan Heimifeng Pumped Storage Power Co.,Ltd. of State Grid Xinyuan Company Limited,Changsha 410213,China)
机构地区:[1]国网新源湖南黑麋峰抽水蓄能有限公司,湖南长沙410213
出 处:《水电站机电技术》2019年第2期36-39,44,95,共6页Mechanical & Electrical Technique of Hydropower Station
摘 要:主要对黑麋峰抽水蓄能电站引水流道主洞、岔管、引水支洞等部位的围岩变形、应力监测、渗压等的变化过程及规律进行分析总结,并参照现场检查的具体情况判断引水流道运行的基本状况,为后续流道安全稳定运行提供有效保障。This paper mainly analyzes and summarizes the change processes and laws of surrounding rock deformation,stress monitoring and seepage pressure of the main diversion tunnel,bifurcated penstock and branch diversion tunnel of Heimifeng Pumped Storage Power Station,and judges the basic operation conditions of the diversion tunnel with reference to on-site specific conditions,so as to provide effective guarantee for safe and stable operation of the diversion channel.
分 类 号:TV672[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.165