作 者:吴亮 牧振伟[1] WU Liang;MU Zhenwei(College of Water Conservancy and Civil Engineering,Xinjiang Agricultural University,Urumqi,Xinjiang,830052;Xinjiang Water Conservancy and Electricity Survey and Designing Institute,Urumqi,Xinjiang,830000)
机构地区:[1]新疆农业大学水利与土木工程学院,新疆乌鲁木齐830052 [2]新疆水利水电勘测设计研究院,新疆乌鲁木齐830000
出 处:《红水河》2019年第1期1-4,共4页Hongshui River
摘 要:KLBL水电站溢洪道出口挑流鼻坎,原设计方案采用单曲挑坎形式,经试验验证下泄流量不满足设计过流能力,严重影响了溢洪道的安全运行。笔者在理论计算的基础上,结合水工模型试验,对溢洪道挑坎体型进行了改进优化,提出采用双曲扩散挑流鼻坎体型,通过模型试验分析,说明设计合理。The spillway outlet flip bucket of KLBL hydropower station,the original design adopted the form of single curvature bucket.The test verifies that the discharge flow is not satisfied with the design flow capacity,which seriously affects the safe operation of the spillway.On the basis of theoretical calculation and combined with hydraulic model test,the authors have improved and optimized the shape of spillway bucket,and proposed the use of hyperbolic diffusion flip bucket shape.The model test analysis shows that the design is reasonable.
关 键 词:溢洪道 挑流消能 挑流鼻坎 模型试验 体型 优化
分 类 号:TV135.23[水利工程—水力学及河流动力学]