综采过断层实践分析  被引量:1

Practice Analysis of Fully Mechanized Mining through Fault

在线阅读下载全文

作  者:李通 LI Tong(Duerping Coal Mine, Xishan Coal Electricity Group, Taiyuan 030022, Shanxi, China)

机构地区:[1]西山煤电集团杜儿坪煤矿,山西太原030022

出  处:《能源与节能》2019年第1期151-152,共2页Energy and Energy Conservation

摘  要:综采作业面过断层期间,顶板破碎性较强,实现对过断层期间作业面顶板的有效控制意义重大。以此为着手点,结合工程实际,对空顶区安全防控和回采期顶板管理进行了综合分析,希望能够为其他矿井相似工程的开展提供借鉴和参考。During the overfault of fully mechanized mining face, the roof fracture is strong, and it is of great significance to rea-lize effective control of working face roof during fault crossing. Taking this as the starting point and combining with the enginee-ring practice, this paper made a comprehensive analysis of the prevention and control of the empty top area for safety and the roof management during the stoping period, in the hope of providing reference for other similar mine projects.

关 键 词:矿井 综采 过断层 安全防控 顶板管理 

分 类 号:TD823[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象