天津周大福金融中心施工智能整体顶升平台供电电缆敷设技术研究  被引量:2

Study on Power Supply Cable Technology for Intelligent Integral Jacking and Lifting Platform During Tianjin Chow Tai Fook Financial Center Construction

在线阅读下载全文

作  者:吴立成 许晓飞 徐航 范志强 刘伟 WU Licheng;XU Xiaofei;XU Hang;FAN Zhiqiang;LIU Wei(China Construction Eighth Engineering Division Co.,Ltd.,Tianjin Branch,Tianjin 300450,China)

机构地区:[1]中国建筑第八工程局有限公司天津分公司,天津300450

出  处:《建筑施工》2019年第1期9-10,共2页Building Construction

摘  要:在超高层建筑施工过程中,供电系统尤为关键。通过对以往施工经验的总结对比以及与电缆厂家的沟通,最终确定了天津周大福金融中心施工智能整体顶升平台供电电缆的选型及敷设方式,保证了供电系统无间断运行,为工程的安全和顺利进行提供了条件。The power supply system is especially critical in the construction process of super high-rise building.Through the summarization and comparison of the previous construction experience and the communication with the power cable manufacturers,the power cable selection and vertical laying are finally determined for the intelligent integral jacking and lifting platform during Tianjin Chow Tai Fook Financial Center construction,which ensures the uninterrupted operation of power supply system and provides conditions for the safe and smooth operation of the project.

关 键 词:超高层建筑 智能整体顶升平台 电缆选型 垂直敷设 施工技术 

分 类 号:TU852[建筑科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象