作 者:沈惠军 王浩[1] 荀智翔[1] 王飞球 朱克宏 SHEN Hui-jun;WANG Hao;XUN Zhi-xiang;WANG Fei-qiu;ZHU Ke-hong(Key Laboratory of Concrete and Prestressed Concrete of Ministry of Education,Southeast University,Nanjing 210096,China;China Railway 24^th Bureau Group Co.,Ltd.,Shanghai 200071,China)
机构地区:[1]东南大学混凝土与预应力混凝土结构教育部重点实验室,南京210096 [2]中铁二十四局集团有限公司,上海200071
出 处:《铁道标准设计》2019年第1期76-81,共6页Railway Standard Design
基 金:国家"973计划"青年科学家专题项目(2015CB060000);中国铁路总公司科技研究开发计划重点课题(2017G002-K)
摘 要:为研究钢桁梁高空横移施工期间临时支墩的安全问题,基于考虑桩土共同作用的临时支墩整体有限元模型,对施工全过程进行模拟分析,利用现场实测结果对模型进行验证,并基于验证后的模型分析钢桁梁与滑道梁之间的内摩擦系数和桩长对施工全过程中临时支墩安全性的影响。分析结果表明:临时支墩沉降、墩顶水平位移和桩顶应变的模拟分析结果与实测结果吻合良好。内摩擦系数在规定取值范围内,对临时支墩沉降和桩顶应力的影响很小,但对墩顶水平位移的影响较为显著,两者之间基本呈正比关系。桩长变化对墩顶水平位移的影响较小,而临时支墩沉降和桩顶应变随桩长增加有明显的下降趋势。In order to study the safety of the temporary pier during the lateral pushing construction process of steel truss girder at a high altitude,the whole construction process is simulated and analyzed,based on the integral finite element model of temporary piers.The model is verified by field test results and the influence of friction coefficient and pile length on the safety of the temporary pier under construction is analyzed based on the verified model.The results show that the settlement of temporary pier,the horizontal displacement at the top of the pier and the strain at the top of the pile are well matched with the measurements.The friction coefficient within the specified range has little effect on the settlement of the temporary pier and the top stress of the pile,while the effect on horizontal displacement at the top of the pier is more significant,and the relationship between the friction coefficient and the horizontal displacement at the top of the pier is basically proportional.The variation of the pile length has little effect on the horizontal displacement at the top of the pier.With the increase of the pile length,the settlement of the temporary pier and the strain at the bottom decrease obviously.
关 键 词:铁路桥 钢桁梁 顶推架设法 临时支墩 数值模拟 现场实测
分 类 号:U445.462[建筑科学—桥梁与隧道工程]