苏岭山大桥钢梁架设方案比选研究  被引量:3

Comparison and selection of construction schemes for Sulingshan Bridge

在线阅读下载全文

作  者:杨蒙 Yang Meng(China Railway Major Bridge Engineering Group the 7th Engineering Co., Ltd., Wuhan 430050, China)

机构地区:[1]中铁大桥局第七工程有限公司,湖北武汉430050

出  处:《山西建筑》2019年第5期173-175,共3页Shanxi Architecture

摘  要:苏岭山大桥为下承式钢桁系杆拱桥,结构复杂,采用整体节点设计,经过初步分析选取3种钢梁架设方案,通过对架设各阶段进行详细分析计算,结合该桥的结构特点、水文地质条件,根据结构受力、施工难度、经济性及工期等方面的综合比较及分析,确定该桥最合适的施工方案。Sulingshan Bridge is a through steel truss tied arch bridge. The structure of the bridge is complex and the integral joint design is adopted. Three erection schemes of steel beams are selected after preliminary analysis. Detailed analysis and calculation of steel girder erection stage are carried out. According to the structural characteristics and hydrogeological conditions of the bridge, the most suitable construction scheme of the bridge is determined by comprehensive comparative analysis of structural stress, construction difficulty, economy and construction period.

关 键 词:钢梁架设 钢桁系杆拱桥 吊索塔架 方案比选 

分 类 号:U448.225[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象