某高层框架-抗震墙结构拆除底部抗震墙工程方案  

Engineering Scheme on Demolishing Shear Wall at the Bottom from a High-Rise Frame and Shear Wall Structure

在线阅读下载全文

作  者:于德广[1] 秦思源 白雪松 YU De-guang;QIN Si-yuan;BAI Xue-song

机构地区:[1]中国恩菲工程技术有限公司,北京100038 [2]中国建筑科学研究院有限公司,北京100013

出  处:《有色冶金节能》2019年第1期53-57,共5页Energy Saving of Nonferrous Metallurgy

摘  要:通过对北京某高层建筑底部抗震墙拆除的工程实例进行分析,给出了拆除底部抗震墙的加固方法、施工措施、工程造价估算等内容。该项目造价高,施工期间影响整个大楼正常使用,地处中心城区环境和噪声污染严重,故此类工程应权衡利弊,慎重处理。Based on the analysis of an engineering example on demolishing shear wall at the bottom from a high-rise building in Beijing, the strengthening method, construction measures and engineering cost estimation of demolishing shear wall at the bottom were given. The project had a high cost, and affected normal use of the whole building in construction period, and was located in the central city with serious environmental and noise pollution, so this kind of project should be treated carefully after weighing the advantage and disadvantage.

关 键 词:框架-抗震墙 拆除抗震墙 加固方法 工程方案 

分 类 号:TU973.1[建筑科学—结构工程] TU352.11

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象