检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钟燕川[1,2] 马振峰 郭海燕[1] 徐金霞[1] 邓国卫[1] ZHONG Yan-chuan;MA Zhen-feng;GUO Hai-yan;XU Jin-xia;DENG Guo-wei(Sichuan Provincial Climate Centre,Chengdu 610000,China;Heavy Rain and Drought-Flood Disasters in Plateau and Basin Key Laboratory of Sichuan Province,Chengdu 610000,China)
机构地区:[1]四川省气候中心,成都610000 [2]高原与盆地暴雨旱涝灾害四川省重点实验室,成都610000
出 处:《西南大学学报(自然科学版)》2019年第1期105-113,共9页Journal of Southwest University(Natural Science Edition)
基 金:国家自然科学基金项目(41275097);四川省科技支撑计划项目(15ZC0098);四川省气象局项目(川气课题2013-开发-09)
摘 要:采用四川省布拖县2012年1月1日-2012年12月31日期间的A和B测风70m和10m高度实测逐时数据,通过布拖县气象站1981-2010年间的逐时风速观测数据,用长年代法进行订正和推算,对该研究区域风能资源参数进行计算.结果表明:A测风塔区域10m高度风能资源应用于并网风力发电为"好"的等级,B测风塔区域70m和10m高度分别为"好"和"很好"的等级,具有较好开发潜力,且风能和风向较为集中,有利于风机布设.测风塔地处高海拔地形较为平坦的山脊地带,临近公路,不占用耕地,气候较为温和,利于风电场修建.The data of wind towers A and B in Butuo of Sichuan province from February 1st to January 31 st,2012 at the height of 70 m and 10 m in Butuo which were corrected by the wind speed data of Butuo Weather Station during 1981-2010 were used to calculate the wind energy resource of Butuo.The results showed that the grade of the wind energy resource at wind tower A at the height of 10 m for the connecting wind power net was"good",and that at wind tower B at the height of 70 m and 10 m was"good"and"very good",respectively,suggesting a good potential for wind energy development.The wind direction and wind energy were relatively concentrated,which is beneficial for the construction of wind turbines.The wind towers are located in a high-altitude terrain and relatively flat area and are close to the highways with a moderate climate,which would not occupy arable land.All these factors are conducive to constructing wind power plants.
分 类 号:P425[天文地球—大气科学及气象学] TK81[动力工程及工程热物理—流体机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229