冰蓄冷系统实测分析与建议  

Ice Storage System Measurement Analysis and Suggestion

在线阅读下载全文

作  者:钱志博 赵雷 程港[1] 岳玉亮[3] QIAN Zhi-bo;ZHAO Lei;CHENG Gang;YUE Yu-liang(China Machinery TDI International Engineering Co., Ltd.;Beijing Chengjian Shiliu Construction Co., Ltd.;China Academy of Building Research)

机构地区:[1]中机十院国际工程有限公司 [2]北京城建十六建筑工程有限责任公司 [3]中国建筑科学研究院

出  处:《建筑热能通风空调》2018年第12期80-84,共5页Building Energy & Environment

摘  要:蓄能空调和电力系统的分时电价相结合,从宏观上可以起到平衡电网,微观上可以为空调用户节省大量运行费用。为验证系统的实际效果,笔者通过近三个月,对深圳某科技园项目进行了实地测试,深度了解了该系统的实际运行效果,并对系统设计,安装,运行及管理提出了一些建议。Combining the time-of-use price of energy-storage air-conditioning and power systems can be used to balance the power grid from a macro perspective,which can save a lot of operating costs for air-conditioning users.The author took nearly three months to conduct a field test on a Shenzhen science and technology park project,mastered the actual operating results of the system,and put forward some opinions on the operation of the system.

关 键 词:冰蓄冷 运行费用 投资回收期 

分 类 号:TU831.3[建筑科学—供热、供燃气、通风及空调工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象