检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢斐[1] 李权[1] 姚文俊 任超 XIE Fei;LI Quan;YAO Wenjun;REN Chao(Hubei Qingjiang Hydroelectric Development Co.,Ltd.,Yichang 443000,China)
机构地区:[1]湖北清江水电开发有限责任公司,湖北宜昌443000
出 处:《水电与新能源》2019年第2期51-54,共4页Hydropower and New Energy
摘 要:针对柳树坪水电站出现的剪断销频繁剪断的问题,通过对系统深入分析,确定是拐臂端盖上导叶顶丝功能缺陷、导叶止推装置结构缺陷、底环泄压孔缺失等原因造成导叶上浮与顶盖剐蹭,使剪断销受力过大而频繁剪断。对此制定了相应的改进预案和措施,经检修中进行相应的处理,从根本上解决了剪断销频繁剪断的问题,提高了机组运行的稳定性。Breaking of the shear pins in the water guide mechanism of generator unit is frequently observed in Liushuping Hydropower Station. In-depth analysis shows that the functional defect of the upper guide vane screw, the structural defect of the guide vane thrust device and the lack of the pressure relief hole in the bottom ring are major reasons, which cause the up-floating of the guide vane and scraping with the top cover, and finally the breaking of shear pins due to excessive shearing force. Correspondingly, renovation measures and treatment plans are made. In practical maintenance, the unit is renovated and the problem is successfully solved.
关 键 词:柳树坪水电站:导水机构 剪断销 原因分析 处理预案 改进措施
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3