检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈聪 Chen Cong(Tianjin Puze Engineering Consulting Co. Ltd., Tianjin 300202, China)
机构地区:[1]天津普泽工程咨询有限责任公司,天津300202
出 处:《供水技术》2018年第5期37-39,共3页Water Technology
摘 要:介绍了新区水厂排泥水处理工程的工艺流程以及构筑物设计。该工程采用重力浓缩+机械脱水处理工艺,建设了排泥水调节池、回用水池、污泥浓缩池、平衡池和脱水机房五大构筑物。排泥水主要来自沉淀池排泥和滤池反冲洗排水,处理排泥水量约为1 800 m3/d,脱水后干污泥外运并安全处置,上清液回流至排泥池。The technological process and structure design of the sludge treatment project in the New District Waterworks was introduced. Gravity concentration-mechanical dewatering treatment process was adopted,and five major structures including sludge discharge regulating tank,reuse tank,sludge thickening tank,balance tank and dewatering machine room were constructed. The sludge discharge water at about 1800 m^3/d mainly came from the sludge discharge of the sedimentation tank and the backwashing drainage of the filter. The dry sludge was transported and safely disposed after dewatering,and the supernatant was reflowed to the sludge discharge tank.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117