检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张弘 左乐 Zhang Hong;Zuo Le(Shanghai Jianke Environmental Consulting Co.,Ltd.,Shanghai 200032,China)
机构地区:[1]上海环科环境评估咨询有限公司,上海200032
出 处:《环境与发展》2019年第2期11-11,13,共2页Environment & Development
摘 要:工程项目建设过程中,需要开展环境影响评价工作,其主要实施过程是预测分析项目建成后对环境产生的影响,并预先确定解决思路及方法,进行污染监测,控制或消除环境污染问题。文章主要论述了国内外环境影响评价研究现状,深入探讨了环境影响评价发展趋势,并提出了环境评价制度改进意见和建议。In the process of project construction,environmental impact assessment is necessary.Its main implementation process is to forecast and analyze the impact on the environment after the completion of the project,and determine the solution ideas and methods in advance,carry out pollution monitoring,control or eliminate environmental pollution problems.This paper mainly discusses the status quo of environmental impact assessment at home and abroad,discusses the development trend of environmental impact assessment in depth,and puts forward suggestions and suggestions for improvement of environmental impact assessment system.
分 类 号:X82[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.175