新时期生活垃圾焚烧发电项目竣工环保验收监测关注重点分析  被引量:4

Analysis on the key points of environmental protection acceptance and monitoring of household garbage incineration power generation project completion in new period

在线阅读下载全文

作  者:张娅 梁健 金典 Zhang Ya;Liang Jian;Jin Dian(Chongqing Ecological and Environmental Monitoring Center,Chongqing 401147,China)

机构地区:[1]重庆市生态环境监测中心,重庆401147

出  处:《环境与发展》2019年第2期149-150,152,共3页Environment & Development

摘  要:根据收工作在现场踏勘阶段和现场监测阶段的关注重点。其中,现场踏勘分主体工程建设、环保设施及措施落实、重大变动界定等3部分进行了介绍;现场监测分工况监督、焚烧炉技术性能测试、废气排放监测、废水排放监测、在线监测系统比对监测、环境质量监测等6个部分进行了归纳总结,并通过实践总结了该类项目在实际验收监测工作中遇到的问题。According to the newly issued Technical Specifications for Environmental Protection Acceptance of Construction Projects Completed in China and the acceptance practice of household garbage incineration power generation construction projects,the key points of environmental protection acceptance of such projects in the field survey stage and acceptance monitoring stage are summarized.The key points of field survey are introduced in three parts: main project construction,implementation of environmental protection facilities and measures,and definition of major changes.The key points of acceptance monitoring are summarized in six parts,including working condition monitoring,technical performance testing of incinerator,exhaust emission monitoring,waste water emission monitoring,online monitoring system comparison monitoring,and environmental quality monitoring,and summarized the problems encountered in the acceptance monitoring of such projects through practice.

关 键 词:新时期 生活垃圾 焚烧发电 环保验收监测 

分 类 号:X83[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象