检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马力 薛新华[1] 蒋楚生[2] 李庆海[2] Ma Li;Xue Xinhua;Jiang Chusheng;Li Qinghai(Sichuan University, College of Water Restource & Hyrdropower, Chengdu 610065, China;China Railway Eryuan Engineering Group Co. Ltd., Chengdu 610031, China)
机构地区:[1]四川大学水利水电学院,四川成都610065 [2]中国中铁二院工程集团有限责任公司,四川成都610031
出 处:《山西建筑》2019年第6期121-122,共2页Shanxi Architecture
摘 要:新建的攀枝花南站地基为昔格达层,昔格达地层物理力学性质非常差,遇水易软化和崩解。因此,研究昔格达层混合填料所填筑而成的高填方路堤的工后沉降值具有非常重要的理论价值和工程意义。借助路基工程中常用的双曲线法和三点法对攀枝花南站典型断面工后沉降进行预测分析研究结果,可以为类似高填方路堤沉降研究提供参考和借鉴。The foundation of the new Panzhihua south railway station is the Xigeda strata. The physical and mechanical properties of Xigeda strata are extremely poor, which is easy to cause geological hazards. Therefore, it is of great theoretical and engineering significance to study the post-construction settlement of high-fill embankments filled with Xiageda layer mixed fillers. The results of the prediction analysis of the post-construction settlement of the typical section of the Panzhihua South Station,using the hyperbolic and three-point methods commonly used in subgrade engineering, can provide reference for similar projects.
分 类 号:U416.0[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.238.5