检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李功洲 高伟 陈章庆 彭飞 LI Gongzhou;GAO Wei;CHEN Zhangqing;PENG Fei(Beijing China Coal Mine Engineering Company Limited,Beijing 100013,China;Beijing Research Institute of Coal Science Combined Application Technology,Beijing 100013,China)
机构地区:[1]北京中煤矿山工程有限公司,北京100013 [2]北京煤科联应用技术研究所,北京100013
出 处:《建井技术》2018年第4期45-48,共4页Mine Construction Technology
摘 要:分析煤矿深厚冲积层冻结法凿井井壁应用大于C80高强高性能混凝土的必要性和冻结法凿井内外层井壁混凝土应用的严酷环境,介绍深厚冲积层冻结法凿井井壁高性能混凝土研究、应用现状与取得的重大创新性成果,指出当前设计和施工应用大于C80高强高性能混凝土存在的问题和对策。The paper had an analysis on a necessity of over C80 high strength and high performance concrete applied to the shaft liner by freezing sinking method in a mine deep alluvium and the applied harsh environment of the concrete for the inner and outer shaft liners in the freezing sinking shaft.The paper introduced the study and the application status on the high performance concrete of the mine shaft liner in the freezing sinking shaft in the deep and thick alluvium,the important innovation results obtained.The paper pointed out the existed problems and countermeasures on the present design and construction application of the C80 high strength and high performance concrete.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171