检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴晓萌 WU Xiaomeng(Economic Management Department,China Railway 16th Bureau Group Co.,Ltd,Beijing 100018,China)
机构地区:[1]中铁十六局集团公司经济管理部,北京100018
出 处:《工程经济》2019年第2期10-13,共4页ENGINEERING ECONOMY
摘 要:临时工程成本作为项目成本的组成之一,其费用大小影响着项目利润的高低。阐述导致临时工程成本偏高的常见问题,包括施工数量超过应有量,材料价格过高,建设标准超过通用设计标准,施工内容单一不灵活,没有考虑地企共建,未利用永临结合,回收和再利用率低。针对上述问题,提出具体的对策,以期达到降本增效的效果。Temporary project cost is one of the components of project cost,and its saving affects the size of project profit.This paper expounds the common problems of leading high cost of temporary project,including the construction quantity exceeding the proper quantity,the price of materials being too high,the construction standard exceeding the general design standard,the single and inf lexible construction content,the joint construction of land and enterprises not being considered,the combination of forever and near not being used,the low recovery and reuse rate.In view of the above problems,puts forward the concrete countermeasures,in order to achieve the effect of reducing cost and increasing efficiency.
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62