Overburden management in open pits: options and limits in large limestone quarries  被引量:6

Overburden management in open pits: options and limits in large limestone quarries

在线阅读下载全文

作  者:Claudio Oggeri Taddeo Maria Fenoglio Alberto Godio Raffaele Vinai 

机构地区:[1]Department of Environment, Land and Infrastructure Engineering, Politecnico di Torino [2]College of Engineering, Mathematics and Physical Sciences, University of Exeter

出  处:《International Journal of Mining Science and Technology》2019年第2期217-228,共12页矿业科学技术学报(英文版)

摘  要:The management of overburden is an important task in open pit exploitations. Site topography and morphology as well as geological and geotechnical properties of natural and remoulded materials are the most important factors affecting the disposal phase. Economic and environmental requirements must be followed in order to achieve the best reclamation results, keeping into account site constraints such as slope stability, hauling and dumping issues, and interactions with groundwater. This paper deals with the above mentioned issues, illustrating a rational approach applied on the case of a large limestone quarry where the thickness of the overburden is relevant and the spoil material has to be dumped in a flooded pit. The proposed multidisciplinary approach led to the selection of most suitable methods for excavation, transportation and disposal. The selection was based on a detailed laboratory and site characterisation that defined favorable and adverse factors to be considered during the preliminary study of a large quarrying project.The management of overburden is an important task in open pit exploitations. Site topography and morphology as well as geological and geotechnical properties of natural and remoulded materials are the most important factors affecting the disposal phase. Economic and environmental requirements must be followed in order to achieve the best reclamation results, keeping into account site constraints such as slope stability, hauling and dumping issues, and interactions with groundwater. This paper deals with the above mentioned issues, illustrating a rational approach applied on the case of a large limestone quarry where the thickness of the overburden is relevant and the spoil material has to be dumped in a flooded pit. The proposed multidisciplinary approach led to the selection of most suitable methods for excavation, transportation and disposal. The selection was based on a detailed laboratory and site characterisation that defined favorable and adverse factors to be considered during the preliminary study of a large quarrying project.

关 键 词:Open pit OVERBURDEN Soil TESTING LIMESTONE QUARRY Muck ON-SITE TESTING 

分 类 号:TD[矿业工程]

 