基于整村整社征地方式的露天煤矿外排土场征地费用研究  

Study on land expropriation cost of external dump in Open-pit Coal Mine based on the whole village land expropriation method

在线阅读下载全文

作  者:郑开慧 张永贵 刘宏宇 石晓东 韩宇 ZHENG Kaihui;ZHANG Yonggui;LIU Hongyu;SHI Xiaodong;HAN Yu(North Weijiamao Coal Electricity Co.,Ltd.,Ordos 017000,China)

机构地区:[1]北方魏家峁煤电有限责任公司,内蒙古鄂尔多斯017000

出  处:《露天采矿技术》2019年第1期72-75,80,共5页Opencast Mining Technology

摘  要:在整村整社征地方式的特殊背景下,提出了外排土场境界确定新方法,实现了降低露天煤矿外排土场征地费用,节约土地资源的目的。阐述了魏家峁露天煤矿外排土场现状,介绍了整村整社征地方式,分析了影响外排土场征地费用的因素,因地制宜提出以村界为外排土场境界划定境界的新方法,在确保安全的基础上增大内排土场容量的方法,节省了巨额征地费用。Under the background of the whole village land expropriation,the article presents a new method of determining the boundary of external dump,which has realized the purpose of reducing the cost of land expropriation in the external dump of the open-pit coal mine and saving land resource.This article expounds the present situation of the external dump in Weijiamao Open-pit Mine,introduces the way of land expropriation in the whole village,analyzes the factors of affecting the cost of the land expropriation in the external dump,and puts forward a new method of delimiting the realm in the external dump,which increase the method of the inner dump capacity and save great cost of land expropriation.

关 键 词:露天煤矿 整村整社 征地方式 外排土场 征地费用 

分 类 号:TD57[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象