Analysis of Construction Duration and Cost for Public Sector Civil Engineering Projects in Libya  

在线阅读下载全文

作  者:Tgarid Ali Xiaohui Zhong Utpal Dutta 

机构地区:[1]Graduate Student, Department of Civil, Architectural, Environmental Engineering, University of Detroit Mercy, Detroit, MI 48221, USA [2]Department of Mathematics, University of Detroit Mercy, Detroit, MI 48221, USA [3]Department of Civil, Architectural, Environmental Engineering, University of Detroit Mercy, Detroit, MI 48221, USA

出  处:《Journal of Civil Engineering and Architecture》2018年第12期838-847,共10页土木工程与建筑(英文版)

摘  要:Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River System 1992-2009, the models identified extension as a main factor that affecting both the actual duration and cost of a project, while considering the contract cost and contract duration as fixed for the project. The suitability of each model was confirmed by examining RMSE (root mean squared error), NSE (Nash-Sutcliffe efficiency), and MEF (modeling efficiency factor). The models were validated with data from 17 different projects. The validation of both models demonstrated that models are very practical and accurate. The models are very effective in capturing the uniqueness of Libyan construction industry practice.

关 键 词:PUBLIC PROJECTS CIVIL engineering PROJECTS actual CONSTRUCTION DURATION actual CONSTRUCTION COST 

分 类 号:TU[建筑科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象