检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孟庆红[1] 陈再 MENG Qinghong;CHEN Zai(Guangdong No.2 Hydropower Engineering Co.,Ltd,Guangzhou 511340,China)
机构地区:[1]广东水电二局股份有限公司,广东广州511340
出 处:《广东水利水电》2019年第2期33-36,共4页Guangdong Water Resources and Hydropower
摘 要:为解决大洞口水闸深厚流塑性淤泥地质条件下土石截流围堰施工取土不便、填筑困难、造价高等问题,截流采用钢板桩+模袋砂轻型围堰方案。该方案结合了钢板桩和模袋砂围堰的优点,具有较好的防渗性能和适应地基变形能力,成功实现了深厚流塑性淤泥河床截流,为主体工程提供了安全、稳定的基坑施工空间,较之传统的土石围堰更经济合理。In order to solve the geological conditions of deep plastic silt in a sluice gate, the construction of earth and rock cutoff cofferdam is inconvenient, difficult to fill, and the high cost is insufficient. The cutoff cofferdam adopts a steel plate pile+mold sandbag light cofferdam scheme. The cofferdam combines the advantages of steel plate piles and mold sandbag cofferdams, has better impermeability and adaptability to deformation of the foundation, successfully completed the deep flow of plastic silt river bed interception, and provided a safe and stable foundation pit construction space for the main project. Compared with traditional earth and stone cofferdams, significant economic benefits have been achieved.
分 类 号:TV551.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.22.217.190