苗尾水电站挑流鼻坎混凝土温控防裂措施分析  被引量:1

Analysis of Temperature Control and Crack Prevention Measures for Concrete of the flip bucket of MIAOWEI power station

在线阅读下载全文

作  者:赵林伟 Zhao Lin-wei(Powerchina huadong engineering corporation limited,Hangzhou)

机构地区:[1]中国电建集团华东勘测设计研究院有限公司,浙江杭州310000

出  处:《云南水力发电》2019年第1期86-89,共4页Yunnan Water Power

摘  要:有限元法是分析温度应力的有效方法,采用有限元法分析苗尾挑流鼻坎的温度应力,并在此基础上提出相应的温控措施。研究结果表明,该结构夏季浇筑时,需控制浇筑温度19℃,且需要通水冷却措施和养护措施。FEM is an effective method to analyze the temperature stress of mass concrete. FEM is used to analyze the temperature stress of the flip bucket of MIAOWEI power station. On this basis, the corresponding temperature control measures are put forward. According to the calculation results, the placement temperature should be less than 19℃, and pipe cooling method and water cure method should also be used to prevent the concrete from cracking in summer.

关 键 词:苗尾 混凝土 温度应力 养护 

分 类 号:TV544.91[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象