作 者:刘晓辉 曾宪涛 谭伟 LIU Xiaohui;ZENG Xiantao;TAN Wei(School of Safety Engineering, North China Institute of Science and Technology,Sanhe 065201,China;JCHX Mining Management Co.,Ltd.,Beijing 101500,China)
机构地区:[1]华北科技学院安全工程学院,河北三河065201 [2]金诚信矿业管理股份有限公司,北京101500
出 处:《中国矿业》2019年第3期87-92,共6页China Mining Magazine
基 金:中央高校基本科研业务费项目资助(编号:3142017086)
摘 要:本文以某缓倾斜中厚破碎磷矿床为研究对象,提出了预控顶分段嗣后充填的开采方案。为解决生产过程中采切比大、护顶工艺复杂、生产能力低等问题,研究了脉内采准的工程布置方式,借助数值模拟手段分析采场围岩的稳定性,确定了合理的开采结构参数,同时结合树脂锚杆+湿喷砼的锚喷联合护顶、磷石膏基复合材料嗣后充填等工艺,最终实现了资源的安全、高效、绿色回采。工程应用表明:采用分段高16m,矿房宽度6m,上部切顶高度4m,下部回采段高12m的开采结构,可保证采场围岩的稳定性,采场生产能力约3 000t/d,贫化率约5%,回收率约86%,采切比约61m3/kt,具有较好的应用效果,为类似工程提供了借鉴意义。In this paper,a gently inclined medium-thick phosphate orebody was taken as the research object,and the pre-controlling roof and sublevel open-stope mining with subsequent filling method was proposed to exploit it.In order to solve the problems in practical production,such as large rate of mining-cut ratio,more complex process for controlling roof stability,and lower production capacity.The method with extraction roadway arranging in orebody was study,and numerical simulation method was used to analyze the stability of surrounding rock in order to obtain the reasonable mining structure parameters.Furthermore,some technologies such as spray anchor net roof support,cemented phosphgypsum backfill,etc.,have been comprehensively applied,at last,the safety,efficiency and green mining of resources was realized.The industrial application shows that:the mining structural parameters of sublevel room with height of 16 m,width of 6 m,cutting height under roof of 4 m and mining height in the bottom of 12 m,can guarante the roof stability.Stope production capacity is about 3000 t/d,the dilution rate is about 5%,the recovery rate is about 86%,the rate of mining-cut ratio is 61 m 3/kt.This mining method has a better application effect,and provides a reference for similar projects.
关 键 词:缓倾斜中厚矿体 预控顶 分段嗣后充填 开采结构参数 采场稳定性