检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张正山 Zhang Zhengshan(China Railway 3rd Building Installation Engineering Co.,Ltd.,Taiyuan 030000,China)
机构地区:[1]中铁三局集团建筑安装工程有限公司,山西太原030000
出 处:《山西建筑》2019年第8期58-60,共3页Shanxi Architecture
摘 要:随着经济以及社会的不断发展,现阶段建筑工程发展愈加快速,已经逐渐成为我国国民经济的重要支柱之一,工程中施工技术的重要性也逐渐凸显出来。通过对复杂地质条件下高强度预应力管桩静压施工过程中出现的具体问题进行分析研究,解决了在复杂地质条件下高强度预应力管桩静压施工的技术难题,并结合实际工程案例总结了施工经验,值得推广和借鉴。With the development of economy and society, the construction engineering is developing more and more rapidly, which has gradually become one of the important pillars of our national economy, and the importance of construction technology is also gradually prominent. In this paper, through the analysis and study of the concrete problems in the static pressure construction of high strength prestressed pipe pile under complex geological conditions, the technical problems of static pressure construction of high strength prestressed pipe pile under complex geological conditions are solved. Combined with practical engineering cases, the construction experience is summarized, which is worth popularizing and drawing lessons from.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222