检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏明禄 Minglu Wei(Xislian coal electricity ( Group) Co.,Ltd,Railway company,Taiyuan 030022,China)
机构地区:[1]西山煤电(集团)有限责任公司铁路公司,太原030022
出 处:《青海交通科技》2018年第3期79-80,共2页Qinghai Transportation Science and Technology
摘 要:铁路路基施工是铺设轨道的基础,科学的路基施工可保证列车的安全运行。路基处理与加固应保证轨顶标高,使其与道路、桥梁和隧道顺利连接,共同组成完整的铁路线路。路基施工过程中面对复杂的地质条件,必须结合实际对路基进行加固处理,这样才能满足铁路运输的承载需求,保证列车的运行安全。本文主要对软土路基基底处理与加固技术进行探索与分析,为地质条件相似的铁路路基施工提供参考与借鉴。The construction of railway subgrade is the basis for the laying of tracks.Scientific subgrade construction can ensure the safe operation of trains.Subgrade treatment and reinforcement should ensure that the elevation of the rail top is connected with roads,bridges and tunnels to form a complete railway line.In the face of complex geological conditions during the construction of the roadbed,it is necessary to reinforce the roadbed in combination with the actual conditions,so as to meet the bearing needs of the railway transportation and ensure the safe operation of the train.This article mainly explores and analyzes the low treatment and reinforcement technology of soft soil roadbed,and provides reference and reference for the construction of railway subgrade with similar geological conditions.
分 类 号:U213.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28