三峡工程175米试验性蓄水运行期的科学调度优化运行试验  被引量:6

Scientific Scheduling Optimization Operation Test in the Trial Impounding Period of the Three Gorges Project to Pool level of EL.175-meter

在线阅读下载全文

作  者:郑守仁[1] Zheng Shouren(Changjiang Water Resources Commission of Ministty of Water Resources, Wuhan 430010, China)

机构地区:[1]水利部长江水利委员会,湖北武汉430010

出  处:《长江技术经济》2019年第1期5-10,共6页Technology and Economy of Changjiang

摘  要:自2008年起,三峡工程由初期蓄水位156.0m运行转入正常蓄水位175m试验性运行。本文归纳总结了三峡工程175米试验性蓄水运行期的水库调度运行方式、优化防洪调度与蓄水调度试验、水资源调度与生态调度试验情况,为三峡工程175m水位试验性蓄水运行结束转入正常运行期,进一步研究科学调度优化运行方案提供借鉴。Since 2008,the Three Gorges Project Reservoir has been on a transition from the initial pool level of EL.156.0 m to the normal pool level of EL.175 m for trial operation purpose.This paper summarizes findings of the reservoir dispatching operation mode,optimized flood control dispatching and water storage dispatching test,water resources dispatching and ecological dispatching tests during the trial impounding period of the Three Gorges Project,and provides reference for further optimizing the reservoir’s operation plan at the NPL of EL.175m.

关 键 词:水库 调度运行 试验性蓄水 三峡工程 

分 类 号:TV698.1[水利工程—水利水电工程]

 