密集建筑物下高承压水上采留比研究  

Study on the Size of Strip Coal Pillar under The Dense Buildings and above the High Confined Water

在线阅读下载全文

作  者:万晓 于飞[2,3] 王岳 Wan Xiao;Yu Fei;Wang Yue(Shandong XinJulong Energy Co., Ltd., Shandong Heze 272102;Coal Industry Ji'nan Design & Research Co., Ltd, Shandong Ji'nan 250031;Consultation & Evaluation Center of Coal Mining Subsidence Comprehensive Treatment Technology ofShandong Province , Shandong Ji'nan 250031)

机构地区:[1]山东新巨龙能源有限公司,山东菏泽274918 [2]煤炭工业济南设计研究院有限公司,山东济南250031 [3]山东省采煤塌陷地综合治理技术咨询评估中心,山东济南250031

出  处:《山东煤炭科技》2019年第3期178-179,182,188,共4页Shandong Coal Science and Technology

摘  要:本文针对1160采区地面村庄稠密、受水威胁严重的问题,综合考虑各种因素,对建筑物下及承压水上采留比理论公式进行推导计算。采取概率积分法进行地表下沉预计,岩体水力学法分析底板破坏,并提出采宽50m、留宽50m的开采方案,运用FLAC3D数值模拟、底板突水机理研究等手段对该方案进行研究,得出该条件下的可行方案。Aiming at the problem of dense ground villages and serious water threat in 1160 mining area, this paper deduces and calculates the theoretical formula of mining retention ratio under buildings and confined water, taking into account various factors. The probability integral method is used to predict the surface subsidence, the rock mass hydraulics method is used to analyze the floor failure, and a mining scheme with a mining width of 50m and a retaining width of 50m is proposed. The scheme is studied by means of FLAC^3D numerical simulation and the mechanism of floor water inrush, and the feasible scheme under this condition is obtained.

关 键 词:建筑物下 承压水上 条带开采 数值模拟 突水系数 

分 类 号:TD823.83[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象