核电厂主变压器冷却系统运行可靠性提升及改进实施  

Improvement of the Operation Reliability of the Cooling System of Main Transformer in Nuclear Power Plant and Its Implementation

在线阅读下载全文

作  者:张瑞斌[1] 宋文修 吴南鹏 ZHANG Rui-bin;SONG Wen-xiu;WU Nan-peng(Daya Bay Nuclear Power Operations and Management Co.Ltd.,Shenzhen 518124,China)

机构地区:[1]大亚湾核电运营管理有限责任公司,广东深圳518124

出  处:《中小企业管理与科技》2019年第5期188-189,共2页Management & Technology of SME

摘  要:变压器冷却系统中存在的各种潜在因素严重影响着变压器的安全稳定运行及寿命,论文从提升核电厂主变压器冷却系统运行可靠性出发,详细分析了影响变压器冷却系统的各种潜在因素,通过科学系统的分析,提出一种科学有效的方法并逐步在现场推广使用。There exists various potential factors in the cooling system of the transformer,which seriously affect the safe and stable operation and life of the transformer.Starting from improving the operation reliability of the cooling system of the main transformer in nuclear power plant,the paper analyzes various potential factors affecting transformer cooling system in detail,and through the scientific and systematical analysis,it puts forward a scientific and effective method,which has gradually been popularized in the field.

关 键 词:电力变压器 冷却装置 可靠性 解决方案 提升 

分 类 号:TM41[电气工程—电器]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象