XX块注水可行性研究初探  

Preliminary Study On Feasibility Of Water Injection In Block XX

在线阅读下载全文

作  者:徐丹[1] Xu Dan(Liaoxing Oil and Gas Development Branch,Liaohe Oilfield Company,PetroChina,Panjin,Liaoning,124010)

机构地区:[1]辽河油田分公司辽兴油气开发公司,辽宁盘锦124010

出  处:《石化技术》2019年第2期104-104,共1页Petrochemical Industry Technology

摘  要:XX块杜家台油层油井投产初期产能大多数都较高,由于靠天然能量开采,能量下降较快,油井产量递减速度也较快,通过对区块注水可行性研究,可达到区块稳产和提高采收率的目的。At the initial stage of production of oil Wells in the dujiatai oil layer of block xx,most of the production capacity was relatively high.As the oil was mined by natural energy,the energy declined rapidly and the oil production declined rapidly.Through the feasibility study of water injection in the block,the stable production and improved recovery rate of the block could be achieved.

关 键 词:注水 杜家台油层 采收率 

分 类 号:TE357.6[石油与天然气工程—油气田开发工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象