检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:余泉 YU Quan(Xiangtan Power Supply Branch, State Grid Hunan Electric Power Co., Ltd., Xiangtan, Hunan 411100)
机构地区:[1]国网湖南省电力有限公司湘潭供电分公司,湖南湘潭411100
出 处:《新型工业化》2019年第2期31-34,共4页The Journal of New Industrialization
摘 要:电网规划是十分复杂的一项系统性工程,具有极大的不明确性与不规律性。随着我国经济的不断发展,电网规模不断扩大,对供电系统的可靠性要求也不断提高,因此,针对大规模、多目标、多阶段电网规划的安全性、适用性与经济性问题,提出分层最优化措施,已成为我国当前供电系统中必须要处理的一个重要问题。基于此,文中提出一种多目标电网规划的分层最优化算法,使计算工作量得到极大降低,并通过算例分析证明了该算法是可靠的。Power grid planning is a complicated systematic project with great uncertainty and irregularity. With continuous development of economy, power grid scale in China has been expanding, and reliability requirements of power supply system have been increasing also. Therefore, in view of security, applicability and economy of large-scale, multi-objective and multi-stage power grid planning, hierarchical optimization measures have been an important issue to be processed in current power supply system in China. Based on this, the paper proposes hierarchical optimization algorithm for multi-objective power network planning, which may reduce computational workload greatly and proves reliability of the algorithm through an example analysis.
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249