检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈波[1] 吴传勇[1] 黎金亮 何平[1] CHEN Bo;WU Chuanyong;LI Jinliang;HE Ping(China Construction Eighth Engineering Division Corp., Ltd. Southwest Branch, Chengdu, Sichuan 610041, China)
机构地区:[1]中国建筑第八工程局有限公司西南分公司,四川成都610041
出 处:《建筑施工》2019年第3期443-445,共3页Building Construction
摘 要:城市综合体建筑钢结构采光顶多采用高空焊接吊装,施工难度大、成本高。借鉴钢结构整体滑移技术,发明了采光顶整体安装施工技术。结合某大型城市综合体项目,对正圆穹采光顶整体安装施工技术的施工原理、操作要点、施工关键点的处理等进行了总结,以期为类似项目提供借鉴。High altitude welding and hoisting are mostly adopted for the construction of steel structure lighting roof of urban complex, which is difficult to construct and costly. Referring to the integral sliding technology of steel structure, an integral installation constructi on technology of lighting roof is invented. Combined with a large urban complex project, this paper summarizes the construction principle, operation key points and the treatment of key points of integral installation construction technology for ortho-dome lighting roof, so as to provide reference for similar projects.
分 类 号:TU755[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15