针对油气田区地铁长大隧道采取的瓦斯管控措施  被引量:1

Gas Control for Long and Large Metro Tunnel through Oil-Gas Field

在线阅读下载全文

作  者:胡慧慧[1] 高峰[1] HU Huihui;GAO Feng(First Branch of Sinohydro Bureau 7 Co., LTD, Pengshan, Sichuan, 620860, China)

机构地区:[1]中国水利水电第七工程局有限公司第一分局,四川彭山620860

出  处:《四川水力发电》2019年第A01期1-3,15,144,共5页Sichuan Hydropower

摘  要:成都轨道交通18号线工程土建5标龙泉山隧道是目前国内地铁工程中最长、采用矿山法施工的瓦斯隧道。作为典型的油气田区高瓦斯隧道,其工程地质条件复杂、施工风险大,要求标准高。结合工程实际,阐述了地铁瓦斯隧道施工所采取的进洞管理措施、超前地质预报、施工通风、信息化施工、瓦斯异常处理等综合管控措施,可供类似工程参考。Longquanshan Tunnel,Civil Work Bid 5 of Chengdu Metro Line 18,is currently the longest gas tunnel in China which mining method has been applied.As a typical high gas tunnel passing through oil-gas field,the geological conditions of this project are complex with high construction risks and high requirements.Combining with project practice,this paper discusses the comprehensive control measures of security check management at tunnel entrance,advance geological forecast,construction ventilation,informatization construction,gas abnormal treatment and etc.which may give references to the similar projects.

关 键 词:油气田区隧道 瓦斯管控 成都轨道交通18号线 

分 类 号:U21[交通运输工程—道路与铁道工程] U23

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象