内江经济开发区城西工业园污水处理厂工程设计  被引量:1

Project design of wastewater treatment plant in Chengxi industrial park of Neijiang economic development zone

在线阅读下载全文

作  者:刘绪为 白永强 LIU Xu-wei;BAI Yong-qiang(North China Municipal Engineering Design and Research Institute, Tianjin 300074, China)

机构地区:[1]中国市政工程华北设计研究总院有限公司

出  处:《工业用水与废水》2019年第2期81-83,共3页Industrial Water & Wastewater

摘  要:内江经济开发区城西工业园产业类型繁多,废水中含有机物、金属离子、酸碱、悬浮物等。工程设计规模为1.8×104m3/d,设计预处理采用调节-澄清-水解酸化工艺,生化处理采用倒置A2O-MBR工艺。介绍了该工程的设计参数、处理工艺流程及其设计特点。该工艺针对性强、稳定可靠,出水达到GB18918—2002《城镇污水处理厂污染物排放标准》一级A标准。As there are many types of industries in Chengxi industrial park of Neijiang economic development zone, its wastewater contains organic matters, metals ions, acid alkali, suspended matters and so on. A project with treatment scale of 1.8 × 104 m3/d was designed for the wastewater treatment, which using adjustment-clarification-hydrolytic acidification as pretreatment process and A2O-MBR as biochemical treatment process. The design parameters, treatment process and design characteristics of the said project were introduced. It could be seen that, the said process had strong pertinence, stable and reliable characteristics, the effluent water quality could meet the requirement of level A grade 1 in GB 18918-2002 Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant.

关 键 词:污水处理厂 工业废水 水解酸化 倒置A2O MBR工艺 

分 类 号:X505[环境科学与工程—环境工程] X703.1

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象