检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄智敏[1,2] 陆汉柱[1,2] 付波[1,2] 罗岸[1,2] HUANG Zhimin;LU Hanzhu;FU Bo;LUO An(Guangdong Research Institute of Water Resources and Hydropower,Guangzhou 510635,China;Guangdong Provinciai Key Laboratoro of Hydrodynamice,Guangzhou 510635,China)
机构地区:[1]广东省水利水电科学研究院,广东广州510635 [2]广东省水动力学应用研究重点实验室,广东广州510635
出 处:《广东水利水电》2019年第4期1-3,9,共4页Guangdong Water Resources and Hydropower
摘 要:水闸下游消能工的体型和布置是工程设计重点关注的问题。以鉴江高岭拦河闸重建工程、韩江东山拦河闸加固改造工程为例,介绍水闸下游消能工的平面分区布置优化研究成果和工程应用,可供类似工程设计和运行参考。The shape and layout of downstream energy dissipator of a sluice are the key issues of engineering design. Taking Jianjiang Gaoling sluice reconstruction project and Hanjiang Dongshan sluice reinforcement and renovation project as examples in this paper,the optimization research results of the partition layout of the downstream energy dissipator of the sluice in plane and project application are introduced, which can be used as reference for similar project design and operation.
分 类 号:TV653[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15