检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁涛 孙天一 姜文 李永强 Liang Tao;Sun Tianyi;Jiang Wen;Li Yongqiang(College of Artificial Intelligence and Data Science, Hebei University of Technology, Tianjin 300130;Jointo Energy Investment Co.Ltd. Hebei, Shijiazhuang 050000)
机构地区:[1]河北工业大学人工智能与数据科学学院,天津300130 [2]河北建投能源投资股份有限公司,石家庄050000
出 处:《高技术通讯》2019年第4期387-394,共8页Chinese High Technology Letters
基 金:河北省科技计划(16214510D;17214304D);石家庄科技局重点研发(181060481A)资助项目
摘 要:为了实现区域性多风电场集控中心对风机的统一运行维护与协调管理,设计了区域性多风电场数据采集与远程集中监控系统,该系统采用用于过程控制的对象连接与嵌入(OPC)技术对多个风电场中风电机组等设备数据进行采集,并完成OPC与104协议转换,借用电力调度数据网实现风电场数据到集控中心安全快速上传,实现对风电场的实时监控;突破风电机组传统意义上的风电机组信息无法与电力系统资源实现整合,不同风机厂家无法实现统一监控等关键技术,从真正意义上实现了风电场的优化运行,并为风电场节约了投资,实现了风电场效益的最大化。To make a regional centralized multi-wind farm control center realize its wind turbine generators’ unified operation and maintenance as well as coordinated management, a data collection and remote centralized monitoring system for regional multi-wind farms is designed. The system uses the object linking and embedding for process control(OPC) technology to collect wind turbines data of a wind farm,and converts OPC protocol data to 104 protocol data. The data of a wind farm is uploaded quickly and safely to the control center by the electric power dispatching data network,so the real-time monitoring of the wind farm is realized. It solves some key technologies.For example,it breaks the traditional concept of a wind turbine unit that the wind turbine information can not be integrated with the power system resources,and different fan manufacturers can not achieve unified monitoring and so on. It achieves the optimal operation of the wind farm in a real sense. And at the same time,it saves the investment and makes the maximum benefit of wind farms.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.46