检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李明松[1] LI Ming-song(Sinopec Northeast Oil & Gas Company Exploration and Development Engineering Department, Jilin Changchun 130062, China)
机构地区:[1]中国石化东北油气分公司勘探开发工程部,吉林长春130062
出 处:《辽宁化工》2019年第3期291-293,共3页Liaoning Chemical Industry
摘 要:七棵树油田SW802条带目前已投入开发近10年,跟同一油田邻区SW8条带及SW10井区对比,初产低,产量递减快,采出程度低,储量难以有效动用。为了找出制约SW802条带高效开发的原因,本文从储层、相渗特征、技术极限井距、及有效驱替系统建立等方面研究着手,找出制约SW802条带高效开发的原因为物性差、驱油效率低、启动压力高、井距大无法建立有效驱替系统。The SW802 block in Qikeshu oilfield has been put into development for nearly 10 years. Compared with SW8 and SW10 blocks in the adjacent area of the same oilfield, it has characteristics of low initial production, fast production decline and low recovery rate. It is difficult to effectively use the reserves. In order to find out the reasons that restrict the efficient development of SW802 blocks, through the study of reservoir, facies permeability characteristics, technical limit well spacing and establishment of effective displacement system, the reasons restricting the efficient development of SW802 blocks were determined,including poor physical properties, low oil displacement efficiency, high start-up pressure and large well spacing.
分 类 号:TE34[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15