检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陆宗磐[1] 陈洪莲[1] LU Zongpan;CHEN Honglian(China Water Resources Beifang Investigation,Design&Research Co.,Ltd.,Tianjin 200222,China)
机构地区:[1]中水北方勘测设计研究有限责任公司,天津300222
出 处:《人民长江》2019年第4期157-162,共6页Yangtze River
摘 要:巴基斯坦N-J水电站地下厂房围岩岩性为软硬相间的砂岩与泥(页)岩,围岩类别以Q4为主,且节理裂隙发育;尾水闸门操作室设在主厂房内,局部形成大跨度的洞室,施工开挖过程中下游边墙产生较大的变形。经分析,厂房布置不合理是变形大的主要原因,而地质条件差则是控制因素,加剧了变形的发展。通过调整开挖次序和增强支护措施,围岩已趋于稳定。The rock lithology for the underground powerhouse of N-J hydroelectric project in Pakistan is alternated beds of sandstone and mudstone (shale).The surrounding rock is mainly classified as Q4 with developed joint fissures.Tailrace gate chambers are located inside the main powerhouse cavern that locally forms a large-span underground cavern.Large deformation occurred on downstream wall during the excavation of the main cavern.Through analysis,it is concluded that the main cause of large deformation is unreasonable powerhouse arrangement,and the poor geological conditions are control factors intensifying the development of deformation.By adjusting the excavation sequence and enhancing the rock supporting measures,the surrounding rock mass has tended to be stable.
分 类 号:TV731[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.163.178