检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:骆志成 张龙生[2] Luo Zhicheng;Zhang Longsheng(Guangzhou Metro Design &Research Institute Co.,Ltd. Guangzhou 510010,China;Guangzhou Design Institute Guangzhou 510620,China)
机构地区:[1]广州地铁设计研究院股份有限公司,广州510010 [2]广州市设计院,广州510620
出 处:《广东土木与建筑》2019年第5期6-9,共4页Guangdong Architecture Civil Engineering
摘 要:为准确模拟施工过程结构的受力和变形状态,考察剪力墙和框架柱的竖向变形差异,利用Midas/Gen对某超高层框筒结构进行施工模拟分析。分析结果对于设计及施工过程均有一定的指导意义,施工时应对结构进行逐层找平,并应考虑到荷载长期效应对结构的影响。In order to simulate accurately the force and deformation of structure during the construction process,investigate vertical deformation difference between shear wall and frame column,construction simulation of the Frame-corewall structure is carried out by Midas/Gen. The analysis results are instructive to the design and construction process. The structure should be leveled layer by layer during construction. Finally, the long-term loading effect on the structure should be considered.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.158