检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭志伟 GUO Zhi-wei(Xiegou Mine,Shanxi Xishan Jinxing Company,Lüliang,Shanxi,033602)
机构地区:[1]山西西山晋兴公司斜沟煤矿,山西吕梁033602
出 处:《煤炭科技》2019年第2期60-63,共4页Coal Science & Technology Magazine
摘 要:以采煤机调高液压系统为对象,对液压系统的工作机理和各个构件的选型进行系统分析,然后通过数值模拟软件进行仿真研究。仿真结果显示,摇臂在8 s时就会升高到指定高度,在调高的起始阶段因电磁阀无法稳定控制液压油的流速,引起了活塞杆运移速率较大,故认为可以将电液控制手段应用在该系统中。Taking the hydraulic system of shearer elevation as the object of study, the working mechanism of the hydraulic system and the selection of each component were systematically analyzed, and then the simulation research was carried out through the numerical simulation software. The simulation results showed that the rocker arm will rise to the specified height in 8 s, and the solenoid valve can not control the flow velocity of hydraulic oil steadily in the initial stage of the elevation, which results in the larger piston rod movement rate. It is believed that the electro-hydraulic control method can be applied in the system.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.52