检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘东 薛庆[1] 张元植 李栋 雷富匀 LIU Dong;XUE Qing;ZHANG Yuanzhi;LI Dong;LEI Fuyun(Sichuan Huaxi Group Co. ,Ltd., Chengdu,Sichuan 610081 , China)
出 处:《施工技术》2019年第8期1-4,共4页Construction Technology
摘 要:对西安环球贸易中心1号塔楼核心筒施工过程中的模架体系进行介绍。该工程将液压全自动顶升大平台模架体系与液压自动爬升模架2种模架体系进行结合,所有模架部件均为模块化设计、装配式安装、重复性利用。在施工过程中依靠自动化液压提升技术与模块部件装配式安装技术,加快施工进度,提高施工自动化程度,保证施工质量,提升整个模架体系的安全性能。The formwork system in the construction of core tube of No. 1 Tower of Xi’an International Trade Center is introduced. The project combines the hydraulic automatic jacking large platform formwork system with the hydraulic automatic climbing formwork system. All formwork components are modular design,assembly installation and repetitive utilization. In the process of construction,the automatic hydraulic lifting technology and modular assembly installation technology speed up the construction progress,improve the degree of construction automation,ensure the quality of construction,and enhance the safety performance of the whole formwork system.
分 类 号:TU745.1[建筑科学—建筑技术科学] U755.2[交通运输工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.87