奔牛水利枢纽立交地涵设计方案比选研究  

Study on the design scheme comparison of overpass culvert of Benniu hydro-junction project

在线阅读下载全文

作  者:王桂智 杨庆庆 武蒙[1] 孙云翰 李建刚 Wang Guizhi;Yang Qingqing;Wu Meng;Sun Yunhan;Li Jiangang(Jiangsu Provincial Water Conservancy Survey and Design Institute Co.,Ltd.,Yangzhou 225127,Jiangsu;Yangzhou Surveying and Design Institute of Water Resource Co.,ltd.,Yangzhou 225007,Jiangsu)

机构地区:[1]江苏省水利勘测设计研究院有限公司,江苏扬州225127 [2]扬州市勘测设计研究院有限公司,江苏扬州225007

出  处:《江苏水利》2019年第5期9-11,共3页Jiangsu Water Resources

摘  要:为使奔牛水利枢纽立交地涵结构可靠,施工方便,造价经济,通过比较2种方案在投资、施工、管理等方面的优缺点,优选出立交地涵设计方案,最终确定采用开挖现浇钢筋混凝土箱涵方案。In order to make the overpass culvert of Benniu Hydro-junction project structure reliable, convenient construction and economical cost, by comparing the advantages and disadvantages of the two schemes in investment, construction and management, the design scheme of the overpass culvert was optimized, and the excavation and cast-in-place is finally determined, and finally decided to adopt the scheme of excavating cast-in-place reinforced concrete box culvert.

关 键 词:立交地涵 设计方案 结构比选 

分 类 号:TV131[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象