超深地下室大直径灌注桩抗拔承载力确定方法分析  

Analysis on determining method of uplift bearing capacity for cast-in-situ pile with large diameter in deep basement

在线阅读下载全文

作  者:黄君一 HUANG Junyi

机构地区:[1]福建省建筑科学研究院有限责任公司福建省绿色建筑技术重点实验室,福建福州350108

出  处:《福建建设科技》2019年第3期38-41,共4页Fujian Construction Science & Technology

摘  要:依据福州市某超高层建筑试桩工程项目特点,通过设置长、短桩分别进行抗拔静载试验并对抗拔承载力进行扣减的方式,得到该项目大直径灌注桩在有效桩长范围内的单桩竖向抗拔承载力,经分析,此方法准确可行。According to the properties of a pile testing project for ultrahigh-rise building in Fuzhou,several uplift static load tests were carried out separately for the long testing piles and the short ones with deduction of uplift bearing capacity. The vertical uplift bearing capacity of single pile with large diameter cast-in-place pile in the effective pile length range is obtained. It is concluded that the method is accurate and feasible.

关 键 词:超深地下室 大直径灌注桩 抗拔承载力 

分 类 号:TU473.1[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象