地铁车站施工临时用电常见问题分析  被引量:7

ANALYSIS COMMON PROBLEMS OF TEMPORARY ELECTRICITY USE IN CONSTRUCTION OF SUBWAY STATION

在线阅读下载全文

作  者:高瑜[1] 王娟[2] 孙思雅[1] GAO Yu;WANG Juan;SUN Si-ya(College of Electrical and Control Engineering, Xi'an University of Science and Technology, 710054, Xi'an, China;College of Science,Xi'an University of Science and Technology, 710054, Xi'an, China)

机构地区:[1]西安科技大学电控学院,西安710054 [2]西安科技大学理学院,西安710054

出  处:《建筑技术》2019年第5期537-540,共4页Architecture Technology

基  金:陕西省自然科学基础研究计划(2015JM5211)

摘  要:分析地铁车站施工临时用电实施过程中存在各种问题。西安地铁4号线某站施工时,临时用电中存在供电方案选择、负荷末端电压损失、二级箱配置、漏电保护配置和开关箱接地等问题。在用电安全第一原则的前提下,通过优化设计方案、并联电容器等措施,减少了用电元器件和电缆材料等投资。There are various problems during the implementation of temporary electricity in subway station construction. The paper takes Xi'an metro line four as an example, and analyzes the choice of the power supply, loss of load terminal voltage、the second-level box configurationleakage protection configuration switch box grounding and other issues in the power supply process. Under the premise of the first principle of electricity safety, through the optimization of design programs, shunt capacitors and other measures,as much as possible to reduce investment of electrical components and cable materials.

关 键 词:地铁车站 临时用电 供电方案 电压损失 

分 类 号:TU74[建筑科学—建筑技术科学] U231[交通运输工程—道路与铁道工程]

 