检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:安文忠 张辉 AN Wen-zhong;ZHANG Hui(CNOOC Datong Coal-to-Gas Project Preparatory Group , zuoyun shanxi 037100)
机构地区:[1]中海油大同煤制气项目筹备组,山西左云037100
出 处:《招标与投标》2019年第5期40-42,共3页Tendering and Bidding
摘 要:本文主要来源于日常管理实践,在国内某煤化工项目未正式开工建设之前,根据国家对环保的要求,为确保污水处理程序的科学性、可靠性,建设单位提出了项目污水中试的方案。本文重点介绍了污水中试项目的采购管理过程,包括合同模式创新、采购程序创新、谈判策略创新以及合同工作界面管理创新等等。This paper mainly comes from daily management practice. Before a coal chemical project in China was officially started, according to the national requirements for environmental protection, in order to ensure the scientific and reliable sewage treatment procedures, the construction unit proposed a project pilot project for sewage. This paper focuses on the procurement management process of wastewater pilot projects, including contract model innovation, procurement process innovation, negotiation strategy innovation, and contract work interface management innovation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15