检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:任建庆 Ren Jianqing(Jiangsu Panasia Medical Science and Technology Group Ltd.,Changzhou,Jiangsu Province,China)
机构地区:[1]江苏环亚医用科技集团股份有限公司
出 处:《暖通空调》2019年第5期78-82,共5页Heating Ventilating & Air Conditioning
摘 要:针对目前手术部净化空调系统常用空气处理模式存在的湿度偏离问题,提出了4种方案并进行了湿负荷计算,通过对比分析,选择第4种方案,即新风机组配置一级水冷表冷器,新风处理至过冷过干并与部分回风一次混合,另一部分回风在循环机组内先经冷却除湿并与一次混合空气进行二次混合,再热或冷却微调送风温度的方案。In view of the humidity deviation of air treatment mode commonly used in the clean air conditioning system of the operating department at present,proposes four schemes and calculates the moisture load.Through comparative analysis,selects the fourth scheme,that is,the outdoor air handling unit is equipped with a primary water-cooled surface cooler,and the cool and dry outdoor air is treated to be subcooled and subdried and mixed with part of the return air for the first time,the other part of the return air is cooled and dehumidified in the circulating unit and mixed with the primary mixed air for the second time,and then heated or cooled to fine-tune the air supply temperature.
关 键 词:独立除湿 热湿负荷 干工况处理 手术部 净化空调系统
分 类 号:TU834.8[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171