核测量设备调试及故障处理研究  

The Debugging and Troubleshooting Research of Nuclear Measurement Equipment

在线阅读下载全文

作  者:孙琦 张芸 张洧川 李昱 黄轲 SUN Qi;ZHANG Yun;ZHANG Wei-Chuan;LI Yu;HUANG Ke(Science and Technology on Reactor System Design Technology Laboratory,Chengdu Sichuan 610213,China)

机构地区:[1]核反应堆系统设计技术重点实验室,四川成都610213

出  处:《科技视界》2019年第9期52-53,57,共3页Science & Technology Vision

摘  要:反应堆核测量系统具有信号微弱,所处环境复杂的特点,因此其电路较复杂、敏感。设备的调试能够验证设计的电路能否满足工程实际应用,对核测量系统的运行有非常重要的作用,是系统设计质量的有效保障。基于某高通量工程试验堆的核测量系统调试,介绍了核测量设备调试的基本方法,包括准备工作、调试步骤等,针对调试过程中出现的问题及解决过程进行了详细的分析总结,对核测量系统调试具有一定指导意义。The nuclear measurement system of reactor has the characteristics of weak signal and complex environment, so its circuit is more complicated and sensitive. The debugging of the equipment can verify whether the designed circuit can meet the practical application of the project, and has a very important role in the operation of the nuclear measurement system, which is an effective guarantee for the system design quality. Based on the nuclear measurement system debugging of a high-flux engineering test reactor, the basic methods of nuclear measurement equipment debugging, including preparation and debugging steps, are introduced. The problems and solutions in the debugging process are analyzed and summarized in detail. The commissioning of nuclear measurement systems has certain guiding significance.

关 键 词:高通量工程试验堆 核测量 调试方法 故障分析 

分 类 号:TM623[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象