检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李雁忠 刘昌平 兰云睆 徐东 Li Yan-zhong;Liu Chang-ping;Lan Yun-huan;Xu Dong
机构地区:[1]航天万源实业有限公司,北京100076 [2]中建三局第二建设工程有限责任公司,武汉430074
出 处:《建筑技术开发》2019年第10期74-75,共2页Building Technology Development
摘 要:结合中建三局在航天六院科研楼工程总承包信息管理过程中遇到的实际问题,将现有平台的内容通过手机端和PC端进行显示操作,综合利用BIM技术的协调性、可视性、模拟性、优化性及数据高度集成的特点,总结了一套基于BIM信息共享技术的施工进度计划管理方式,以为类似工程提供借鉴。Combining the practical problems encountered by the China Construction Third Bureau in the general contracting information management process of the research institute of the Sixth Academy of Aerospace,the content of the existing platform is displayed through the mobile terminal and the PC,and the coordination and visibility of the BIM technology are comprehensively utilized. The characteristics of sex, simulation, optimization and data integration are summarized. A set of construction schedule management methods based on BIM information sharing technology is summarized to provide reference for similar projects.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49