发电厂2×600MW机组TSI升级改造  被引量:1

Upgrade and reconstruction of 2*600MW units in Tashan Power Plant

在线阅读下载全文

作  者:俞玉春 YU Yu-chun(Shanxi Zhangdian Datang Tashan Power Generation Co.,Ltd.,Datong 037001,China)

机构地区:[1]山西漳电大唐塔山发电有限公司,山西大同037001

出  处:《电气传动自动化》2018年第4期47-48,53,共3页Electric Drive Automation

摘  要:针对电厂2×600MW空冷机TSI的升级改造,首先介绍了工程概况,其次分析了原设备应用现状与问题,明确系统升级改造的方向,再次从单体校验、机组调试两个方面论述了系统升级改造,最后总结了改造效果,从而总结出塔山电厂目前汽轮机运行存在的问题,以期能够加快实现汽轮机改造与升级。In view of the upgrade and reconstruction of 2×600 MW air cooling machine TSI in Tashan Power Plant, first of all, the project overview is introduced. Secondly, the application situation and problems of the original equipment are analyzed, and the upgrade and reconstruction direction of the system is made clear. Thirdly, the system's upgrading and reconstruction are expounded from the perspective of single verification and unit debugging. Finally, the reconstruction effect is summed up, and then the problems existing in the steam turbine operation of Tashan Power Plant are summarized, in order to speed up the implementation of reconstruction and upgrade of the steam turbine.

关 键 词:塔山电厂 2×600MW机组 TSI升级改造 空冷汽轮机 

分 类 号:TM63[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象