检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张文铸 魏冲 Zhang Wen-zhu;Wei Chong
机构地区:[1]中国市政工程华北设计研究总院有限公司西安分公司
出 处:《建筑技术开发》2019年第8期1-2,共2页Building Technology Development
摘 要:以西安市西咸新区某给水厂取水泵房下部结构设计为例,从地基基础与抗浮设计、池壁内力计算、施工注意事项等方面进行深入剖析,并针对圆壳池壁与矩形池壁相连节点,从传统手算与有限元计算进行对比分析,为类似工程提供设计经验。Taking the structural design of the lower part of the intake pump house of a water supply plant in Xixian New District of Xi’an City as an example,this paper makes a thorough analysis from the aspects of foundation and anti-floating design,internal force calculation of the pool wall and matters needing attention in construction,especially the connection between the round shell pool wall and the rectangular pool wall from the traditional manual calculation and the finite element analysis,so as to provide design experience for similar engineers.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117