检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴胤斌 刘祚秋[1] WU Yin-bin;LIU Zuo-qiu(Sun Yat-sen University,Guangzhou 510275,China)
机构地区:[1]中山大学
出 处:《广东水利电力职业技术学院学报》2019年第2期1-4,16,共5页Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
摘 要:通过对海南儋州区域某水工工程钢管桩的竖向静载试验及桩侧摩阻力试验数据进行研究,分析超长大直径钢管桩在该区域深厚沉积层的竖向承载性状和荷载传递机理,积累该区域的深厚沉积层土层侧阻力系数样本数量,为该区域后续工程或相似区域工程提供经验与参考。Based on the test data of vertical static load test and pile side friction resistance test,the authors analyze the characteristics of vertical bearing capacity and load transfer mechanism of the super-length and largediameter steel pipe piles in the deep sediments,at an area which in a Hainan port,and collect sample numbers of friction coefficients in the deep sediments of the area,in hope to provide reference for projects in similar situation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222