检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:程建华 CHENG Jian-hua(Hubei Electric Power Survey and Design Institute Co., Ltd., Wuhan 430040, China)
机构地区:[1]湖北省电力勘测设计院有限公司
出 处:《江西电力职业技术学院学报》2019年第2期1-2,共2页Journal of Jiangxi Vocational and Technical College of Electricity
摘 要:大跨越是送电线路极其重要时组成部分,跨江方案与工程造价密切相关,跨江点要求选择在地形优越、跨距小以及水文、地质条件较好的地方,并应与一般线路综合考虑,通过技术经济比较确定推荐方案。Long-span was an extremely important part of transmission lines. The cross-river project was closely related to the project cost. The cross-river point should be selected where the topography was superior, the span was small, and the hydrological and geological conditions were good. The recommended project should be determined through technical and economic comparison with the general line.
分 类 号:TV734.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.103.13